Close Menu
Xsum NewsXsum News

    Stay Updated.

    Get the latest Africa-focused business & infrastructure news and more directly to your inbox.

    What's Hot

    Minister of Energy, Hydropower and Hydrocarbons of Guinea Conakry participates in MSGBC Oil, Gas Power 2025

    The “forgotten history” of how the U.S. government isolated the United States: NPR

    Africa risks losing $415 billion a year without sustainable finance

    Facebook X (Twitter) Instagram
    Trending
    • Minister of Energy, Hydropower and Hydrocarbons of Guinea Conakry participates in MSGBC Oil, Gas Power 2025
    • The “forgotten history” of how the U.S. government isolated the United States: NPR
    • Africa risks losing $415 billion a year without sustainable finance
    • Breaking down barriers to private sector investment to build resilience on West Africa’s coasts
    • Cape Verde secures €17.7 million from African Development Bank, what digital transformation plan actually means for Africa’s future
    • FG Gold, AFC and Afreximbank close on USD 330 million senior debt financing for Baomafun Gold Project — TradingView
    • Africa needs to build its own cybersecurity intelligence, Tisel CEO says at AfriTech 5.0 – Nigerian CommunicationWeek
    • SA construction comes roaring back: 10% jump signals sector revival
    X (Twitter) Instagram YouTube LinkedIn TikTok
    Xsum NewsXsum News
    • African Development Bank
    • Africa Finance Corporation
    • All Africa – Construction & Infrastructure
    • Africa Intelligence
    • Construct Africa
    • More
      • Mining Review Africa
      • Energy Capital Power
      • Sustainability & Climate-Resilient Infrastructure
      • Private-Sector Infrastructure Players
      • Urban Development & Housing
    Xsum NewsXsum News
    You are at:Home»Construct Africa»Niger plans to improve key trade routes
    Construct Africa

    Niger plans to improve key trade routes

    Xsum NewsBy Xsum NewsNovember 17, 2025No Comments4 Mins Read0 Views
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr Email Reddit
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email

    According to a procurement plan released at the end of June, Niger’s Ministry of Transport and Equipment plans to solicit bids by August 5 for the rehabilitation and renovation work on National Route 1 (RN1) in the country’s south.

    The initiative is part of the World Bank-funded Project for Integration and Connectivity in Southern Niger (PICSN), which was approved in late May and aims to improve climate-resilient road connectivity and enable value chain logistics development in southern Niger.

    The RN1 section to be repaired is the 232.9km Maradi-Zindel road, which will be widened and improved. The construction work is divided into four sections: 40.9km between Maradi and Chadua, 83.9km between Chadua and Tessaua, 60.7km between Tessaua and Takieta, and 47.4km between Takieta and Zinder.

    Bids from contractors will open on September 16, and the contract is expected to be signed by January 3, 2026.

    In early June, the ministry solicited interest from consultants for four contracts for the provision of control and monitoring services for the rehabilitation of National Highway No. 1 (RN1) in the south of the country. Four companies have been selected to carry out work monitoring and control services, which are expected to be completed within 27 months.

    The 1,800 km long RN1 is Niger’s lifeline and relies heavily on its road infrastructure and agricultural sector to drive socio-economic development. The highway serves as an artery for approximately 70% of the population and supports nearly 88% of agricultural activities.

    RN1 consists of the following sections: Part of the Trans-Saharan Road (TSR) between the Mali border and Niamey. The Niamey-Maradi section is part of the Trans-Sahel Highway (TSH). Maradi-Zinder section connecting TSH and TSR in RN1. The Zander-Chad border section is also part of the TSR corridor. Ensuring year-round resilient connectivity between the RN1, TSH and TSR corridors will improve access, agro-pastoral product flows and trade potential for selected value chains at the sub-regional level.

    Map showing RN1 route
    Source: Project Evaluation Report, April 2025

    RN1 was affected by the 2024 floods and is currently in a deteriorated state, with speeds below 60km/h.

    PICSN will also finance the rehabilitation and upgrading to climate-resilient standards of around 25 km of feeder roads connecting the Maradi-Zindall section and around 500 km of rural roads connecting to the hinterland of the RN1 catchment in the Maradi-Zindall region, as well as the construction of 50 km of concrete block ditches in areas at high risk of flooding.

    In addition, the project will fund technical research and environmental and social (E&S) measures to rehabilitate and upgrade paved road sections to climate-resilient standards. These roads will be selected during implementation to prioritize climate-resilient connectivity in the RN1 catchment. These could include the Jinda Bypass Road, Maradi Junction on RN1, the 50km Maradi-Dan Issa-Nigeria Border Road, and the 70km Takyeta-Matamae-Nigeria Border Road.

    PICSN will also fund technical studies and consultancy services to prepare E&S measures for the construction of the Magaria border crossing and Maradi dry port. The proposed dry port will complement ongoing works on the 284km Kano-Maradi Railway, linking Maradi with Kano in northern Nigeria. This project is fully funded by the Nigerian government. Construction of the US$1.96 billion project is expected to begin in February 2021 and be completed in June 2026.

    Mota Engil Nigeria has been appointed to develop and construct a network trunk linking the three federal states of Kano, Jigawa and Katsina in northern Nigeria. The railway includes a 108km branch line running between Kano and Dutse, the capital of Jigawa State.

    Combined with the dry port in Maradi, this infrastructure will create a seamless and efficient export corridor between Niger and Nigeria, eliminating last-mile connectivity challenges.

    The implementing agency for PICSN is the Ministry of Transport, and the entire project is scheduled for completion in September 2031.

    An estimated 16.4 million people (5.2 million in Niger and 11.2 million in Nigeria) living within the 150km Maradi-Jinder section of RN1 are expected to benefit indirectly through improved climate-resilient connectivity, access to services and infrastructure, and increased trade and economic opportunities.

    Kano-Maradi Railway Main Line Source: Project ESIA Report, August 2024
    Kano-Maradi railway main line
    Source: Project ESIA Report, August 2024

    Top photo: Niger roads (Source: Facebook@Niger Ministry of Transport and Equipment)

    improve Key Niger plans routes trade
    Share. Facebook Twitter Pinterest LinkedIn Reddit WhatsApp Telegram Email
    Previous ArticleMozambique’s LNG restart marks a turning point for African gas
    Next Article The construction sector is a key driver of SA’s economic growth | Ramaphosa. – Full view
    Xsum News
    • Website

    Related Posts

    Comoros to win subsidy from AfDB for geothermal project

    December 6, 2025

    Water resource management is the key to sustainable development in Africa

    December 5, 2025

    Construction begins on East Africa’s largest railway training facility in Ethiopia

    December 5, 2025
    Leave A Reply Cancel Reply

    Top Posts

    A United Continent on the Move: Ambassador Kouyateh’s Call for an African Logistics Renaissance

    November 20, 202527 Views

    2 Core infrastructure for African submarine cable completed China Mobile advances digital intelligence development in Africa

    November 20, 202512 Views

    LIBERIA’S DEVELOPMENT AGENDA GAINS GLOBAL ATTENTION

    November 18, 202511 Views

    Africa’s clean cooking drive depends on carbon credit reform and transport upgrades

    November 25, 202510 Views
    Don't Miss
    Energy Capital Power December 6, 2025

    Minister of Energy, Hydropower and Hydrocarbons of Guinea Conakry participates in MSGBC Oil, Gas Power 2025

    Aboubakar Camara, Minister of Energy, Hydropower and Hydrocarbons of Guinea-Conakry, has been confirmed as a…

    The “forgotten history” of how the U.S. government isolated the United States: NPR

    Africa risks losing $415 billion a year without sustainable finance

    Breaking down barriers to private sector investment to build resilience on West Africa’s coasts

    Stay In Touch
    • Twitter
    • Instagram
    • YouTube
    • LinkedIn
    • TikTok

    Stay Updated.

    Get the latest Africa-focused business & infrastructure news and more directly to your inbox.

    About Us
    About Us

    Xsum News is Africa’s digital window into the future of business. We tell stories of innovation, enterprise, and investment that are shaping the continent’s economic rise. African Business, Added Up.

    X (Twitter) Instagram YouTube LinkedIn TikTok
    Our Picks

    Minister of Energy, Hydropower and Hydrocarbons of Guinea Conakry participates in MSGBC Oil, Gas Power 2025

    The “forgotten history” of how the U.S. government isolated the United States: NPR

    Africa risks losing $415 billion a year without sustainable finance

    Most Popular

    African Development Bank praises Algeria’s development model, aims to replicate its success across the continent

    Considering the redefinition of African capital by UBA and Arauba

    G20 Energy Investment Forum brings together Africa’s top finance, insurance and technology leaders

    © 2025 Xsum News. All Rights Reserved.
    • 🌍 About Xsum News
    • 📬 Contact us
    • Privacy Policy
    • Terms & Conditions
    • Disclaimer

    Type above and press Enter to search. Press Esc to cancel.